
St George Mining Ltd (ASX:SGQ, FRA:S0G, OTC:SGQMF) has delivered its thickest and most compelling drill result yet from the Araxá Rare Earths and Niobium Project in Brazil, with a standout intercept of 178.7 metres at 4.34% total rare earth oxides (TREO) and 0.75% niobium oxide (Nb₂O₅) from surface.
The result — the thickest mineralised interval recorded at Araxá to date — underscores the scale, grade and near-surface continuity of the deposit, reinforcing its status as one of the most significant undeveloped rare earths and niobium projects globally.
It forms part of a broader batch of assay results from 15 diamond drill holes, with multiple wide, high-grade intercepts continuing to demonstrate consistency across the system.
Oblique section showing the latest diamond drill holes as well as other significant drilling completed in the current campaign. The latest drill holes with red labels.
Among the highlights:
-
165.3m at 4.28% TREO and 0.61% Nb₂O₅ from surface
-
150.2m at 4.64% TREO and 0.59% Nb₂O₅ from surface
-
163.65m at 3.29% TREO and 0.45% Nb₂O₅ from surface
-
81.05m at 5.14% TREO and 0.64% Nb₂O₅ from surface
These results continue to highlight a defining feature of Araxá — very thick, high-grade mineralisation starting at surface, supporting the potential for a low-strip, open-pit mining operation.
Section A – A’ showing high-grade TREO intercepts (cut-off 1% TREO) and high-grade Nb2O5 intercepts (cut-off 0.2% Nb2O5) along with the existing MRE outline.
Executive chairman John Prineas said the combination of scale and grade, particularly from surface, sets Araxá apart from comparable projects.
“The drilling results continue to show huge true widths from surface paired with very high grades,” he said.
“This unique combination is unrivalled among emerging rare earths and niobium developers,” he added. “The commercial advantage of high-grade mineralisation starting from surface — as opposed to 50 metres or even more than 100 metres below surface — cannot be underestimated.”
Section B – B’ showing high-grade TREO intercepts (cut-off 1% TREO) and high-grade Nb2O5 intercepts (cut-off 0.2% Nb2O5) along with the existing MRE outline, showing the expansion of the existing MRE.
High-grade system continues to expand
Drilling at Araxá has now been running continuously for more than six months, with the current program designed to both expand and upgrade the mineral resource estimate.
The latest results demonstrate strong grade continuity over broad intervals and suggest further upside, with the mineral system remaining open in all directions and at depth.
latest_posts
- 1
6 Web-based Lawful Administrations: Extensive Surveys and Elements - 2
Artemis II crew take new photo of far side of the moon - 3
Which Instax Camera Would it be a good idea for you to Purchase? - 4
Damaged launch pad: How long before Russia can send astronauts to the ISS again? - 5
Artemis II astronauts will see parts of the moon no human has before. Here’s how
Find the Captivating Professional flowerbeds of the US
Moon rush: These private spacecraft will attempt lunar landings in 2026
Artemis 2 astronauts fly around the moon in record-breaking lunar loop by NASA
'Dancing with the Stars' semifinals: How to watch Episode 10 tonight, where to stream, who's left and more
Artemis II live updates: NASA's moon mission breaks Apollo record for farthest distance humans have traveled from Earth
The most effective method to Remain Ahead in the Most recent Advanced Patterns with a Web based Advertising Degree
Instructions to Perform Fundamental Upkeep on Your Slam 1500.
Comet C/2025 K1 (ATLAS) breaks apart in incredible telescope photos
Administrative building in Sharjah region targeted by Iranian drone, UAE authorities announce













